Nimrod Sailing← All trips
Trip 1 · Completed · 6–11 September 2026

Oban to Bangor

What began as a passage towards Belfast ended in Bangor after a fuel-line fault near Jura. Nimrod reached harbour safely; the repair was completed before the next leg.

PaulHelenYen
  1. The route

    South from Oban

    Nimrod headed south via Crinan and Gigha, with Belfast the original destination.

  2. Near Jura

    Fuel-line fault

    An engine fault changed the plan. With no repair possible at sea, Nimrod sailed overnight towards Bangor.

  3. 11 Sep

    Bangor

    Nimrod reached Bangor safely. The planned continuation to Belfast did not take place on this leg.

After this leg

Repair complete, voyage continued

The fuel-line repair was completed on 16 September. Nimrod then sailed from Bangor via Ardglass to Dún Laoghaire on the next passage.